Lorem ipsum dolor sit amet, consectetur adipiscing elit. Fusce gravida felis non lobortis mattis. Nunc rutrum viverra odio. Nulla vitae lorem fringilla, congue elit vitae, efficitur magna. Proin commodo porta felis eu rutrum. Donec in est id urna molestie semper eget id turpis. Duis quis feugiat sem. Cras eu tortor fringilla, semper eros eu, congue augue. Quisque quis feugiat ipsum.

Pellentesque ipsum eros, cursus quis rhoncus et, porta at velit. Curabitur eu tellus auctor, posuere massa nec, suscipit libero. Aenean a ligula imperdiet, finibus lectus nec, viverra odio. Mauris rhoncus finibus augue, nec auctor ante laoreet ac. Nulla lectus nisi, semper ac tristique eu, imperdiet eget massa. Nullam ut justo felis. Mauris porttitor lectus ac purus fermentum, id mattis nibh vestibulum. In fringilla diam at massa maximus, vel laoreet eros vestibulum. Quisque rutrum nisi imperdiet, dignissim arcu sit amet, faucibus ipsum. Nullam feugiat urna non arcu gravida vestibulum. Morbi at mollis diam, sit amet pretium ante. In vehicula gravida urna, sed venenatis magna consequat in.

PROJECTS

2016

  • Supervision of construction activity of the Wastewater collection network, force mains, manholes, inspection chambers and pumping station in Salmoon village (total area 150 ha), Tima Markaz in Sohag Governorate, Egypt (USAID funded Project)

 

  • Supervision of construction activity of water pipeline 800mm diameter with total length 5500 m including valve chambers, water pumping station with design flow of 50,000 m3/day, water hammer system, generator, transformer, Ain Sukhna, Suez governorate, Egypt.
PROJECTS

2010

  • Supervision of construction activity in Lake Dream, 6 October city, Egypt for the followings items:
    1. Water and fire distribution networks
    2. Irrigation Network
    3. Ground Reservoirs
    4. Sewerage Networks
    5. Roads works

 

  • Supervision of construction activity of main trunk sewer with diameters from 225 mm to 1500 mm by pipe jacking with total length including shafts, Heliopolis, Cairo, Egypt.
PROJECTS

2009

  • Supervision of construction activity of sewerage network, pumping stations, canal crossing and force mains in Assuit governorates for the following projects:
    1. Wastewater collection network in Elwasta , Awlad serag and Altall Village – Elfath markaz with area 133 ha, Assuit governorate, Egypt.
    2. Wastewater collection network in Bosra Village – Elfath markaz with area 38 ha, Assuit governorate, Egypt.
    3. Wastewater collection network in Garf Sarhan Village – Dayrout markaz with area 76 ha, Assuit governorate, Egypt.
    4. Wastewater collection network in Al-Hamam Village – Abanob markaz with area 122 ha, Assuit governorate, Egypt.
    5. Wastewater collection network in Aloqal bahary Village – Albadary markaz with area 94 ha, Assuit governorate, Egypt.
    6. Wastewater collection network in Aloqal Qebly Village – Albadary markaz with area 87 ha, Assuit governorate, Egypt.
    7. Wastewater collection network in Alquseer Village – Alquseya markaz with area 261 ha, Assuit governorate, Egypt.
    8. Wastewater collection network in Al Nekhela Village – Aboteeg markaz with area 78.8 ha, Assuit governorate, Egypt.
    9. Wastewater collection network in Bany Ghaleb Village – Assuit markaz with area 70 ha, Assuit governorate, Egypt.
    10. Wastewater collection network in Bany Magd Village – Manfalot markaz with area 148 ha, Assuit governorate, Egypt.
    11. Wastewater collection network in Magrees Village in Asyut Governorate with total area 61 ha, Assuit governorate, Egypt.

 

  • Supervision of construction activity of sewerage network, pumping stations, canal crossing and force mains in AL-Monofya governorates for the following projects:
    1. Wastewater collection network in Om Khnan and Kafr Elarab and Alagayzah Village in AL-Monofya Governorate with total area 192 ha, AL-Monofyia Governorate, Egypt
    2. Wastewater collection network in shobra qebala Village in AL-Monofya Governorate with total area 52 ha, AL-Monofyia Governorate, Egypt
    3. Wastewater collection network in Taha shobra Village in AL-Monofya Governorate with total area 181 ha, AL-Monofyia Governorate, Egypt
    4. Wastewater collection network in Kafr Abshesh Village in AL-Monofya Governorate with total area 44 ha, AL-Monofyia Governorate, Egypt
    5. Wastewater collection network in Kafr Zain eldeen Village in AL-Monofyia Governorate with total area 39 ha, AL-Monofyia Governorate, Egypt
    6. Wastewater collection network in Monshaat Om Khanan Village in AL-Monofya Governorate with total area 18 ha, AL-Monofyia Governorate, Egypt
    7. Wastewater collection network in Ashleem and Kafr Ashleem and kafr Alsalamia Village in AL-Monofya Governorate with total area 120 ha, AL-Monofyia Governorate, Egypt

 

  • Supervision of construction activity of water distribution network and sewerage network, pumping stations, force mains in two zones in new Damietta city. These two zones are: 52 Buildings area and Creational Area at the center of New Damietta city, Damietta governorate, Egypt.

 

  • Supervision of construction activity of sewerage network in Arab Abo Dahroug Sewerage System. The sewerage system consists of sewers with diameters range from 150 mm to 500 mm with total length 15 Km, 313 Manhole (281 Circular Manhole & 32 Rectangular Manhole, and 982 House Connection, , Arab Abu Dahroug, Helwan District, Cairo governorate.

 

  • Supervision of construction activity of sewerage network and pump station in Ezbet Elsaaida. The sewerage system consists of sewers with diameters ranges from 200 mm to 700 mm with total length 4.5 Km and 212 Manholes, Ezbet Elsaaida, El Marg governorate, Cairo.

 

  • Supervision of construction activity of water distribution network in Ezbet Shaker El bahary. The water network consists of pipes with diameters ranges from 110 mm to 315 mm with total length 9.6 Km and valve chambers, Ezbet Shaker El bahary, El Marg governorate, Cairo.
PROJECTS

2006

  • Supervision of construction activity of Conference Hall in Open Arab University, Nasr City, Cairo governorate, Egypt. The supervision activities include the followings:
    1. Wooden furniture, chairs and wall gladding with wood
    2. Lighting and Lightning protection
    3. Fire alarm & Fire Fighting System
    4. Public Address (Sound System)
    5. Plumbing
    6. HVAC
    7. Fire Fighting
    8. Architecture & Structural
    9. Translation equipment
    10. Data Show equipment

 

  • Supervision of construction activity of Office of His Excellency Talal in Open Arab University, Nasr City, Cairo governorate, Egypt. The supervision activities include the followings:
    1. Kitchen and Toilets
    2. Wooden furniture, chairs and wall gladding with wood
    3. Lighting and Lightning protection
    4. Fire alarm & Fire Fighting System
    5. Plumbing
    6. HVAC
    7. Fire Fighting
    8. Architecture & Structural

 

  • Audit Construction activities and operation and maintenance for Degremont for Gabal Al Asfar Wastewater Treatment Plant – Contract # 19, Cairo, Egypt. the tasks include the followings:
    1. Study Contract Documents to learn of the contractual requirements for quality control and audit of quality control.
    2. Review all inspection reports, procurement reports, testing reports, condition reports, non-conformance reports, and shop drawing submittals to determine any deficiencies. Recommend corrective action for these deficiencies.
    3. Review punch lists of all features.
    4. Review as-built drawings for completeness.
    5. Review additional documentation for completeness such as O & M Manuals and preventive maintenance programs.
    6. Submit a Complete Audit Report without attaching copies of the reviewed material.
    7. Current status of the project versus stated goals as related to schedule, construction costs.
    8. Future status which shall cover the estimate total cost of project, expected time of completion.

 

  • Review and Approval of Shop Drawings of King Khaled University Campus for Phase 1, 2 and 3 – Abha – Kingdom of Saudi Arabia. The scope of work includes the professional review and approval of shop drawings for phase 1, 2 and 3. The estimated drawings are around 100,000 DWG’s. Review the Contractor’s shop drawings and ensure compliance with contract drawings and relevant codes and contract specification. Checking the necessary calculations, e.g., Electrical or HVAC load calculations. The works includes the whole college for boys and girls and Hospitals with 800 beds capacity. The drawings include the followings disciplines:
    1. Electrical drawings which includes:
    2. Lighting and Lightning protection drawings
    3. Fire alarm drawings
    4. Public Address (Sound System) drawings
    5. Checking coordination of shop drawings between different disciplines.
    6. EIB drawings
    7. Gas pipelines
    8. Plumbing: water supply (cold and hot) and drainage pipelines
    9. HVAC drawings
    10. Fire Fighting drawings
    11. Architecture drawings
    12. Structural drawings
    13. MATV drawings and CCTV drawings
    14. Grounding
    15. Site works (low current and power)
    16. Storm water drainage for the campus site
    17. Medium voltage
    18. BMS drawings Clock system drawings
    19. Data Cables and Telephone drawings
    20. Power cables and details drawings