Skip links

PPP – Projects

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Fusce gravida felis non lobortis mattis. Nunc rutrum viverra odio. Nulla vitae lorem fringilla, congue elit vitae, efficitur magna. Proin commodo porta felis eu rutrum. Donec in est id urna molestie semper eget id turpis. Duis quis feugiat sem. Cras eu tortor fringilla, semper eros eu, congue augue. Quisque quis feugiat ipsum.

Pellentesque ipsum eros, cursus quis rhoncus et, porta at velit. Curabitur eu tellus auctor, posuere massa nec, suscipit libero. Aenean a ligula imperdiet, finibus lectus nec, viverra odio. Mauris rhoncus finibus augue, nec auctor ante laoreet ac. Nulla lectus nisi, semper ac tristique eu, imperdiet eget massa. Nullam ut justo felis. Mauris porttitor lectus ac purus fermentum, id mattis nibh vestibulum. In fringilla diam at massa maximus, vel laoreet eros vestibulum. Quisque rutrum nisi imperdiet, dignissim arcu sit amet, faucibus ipsum. Nullam feugiat urna non arcu gravida vestibulum. Morbi at mollis diam, sit amet pretium ante. In vehicula gravida urna, sed venenatis magna consequat in.

PROJECTS

2013 – 2015

  • Technical consultant for CAPW and MOF’s – Abu Rawash wastewater treatment plant PPP Project (1.6 million m3/day).
    1. Population Forecasting
    2. Determine the present and estimate the future population served by Abu Rawash WWTP. Wastewater Flow and Design Loads Determination.
    3. Determine the present and future wastewater flow, BOD and SS loads
    4. Environmental Laws regarding the treated Effluent
    5. Alternative of wastewater Treatment Process
    6. Prepare the Conceptual Design
    7. Design of wastewater treatment plant with capacity 1.6 million m3/day for primary, secondary, tertiary and sludge treatment units.
    8. Design of sewage influent pump station, return sludge pump station, excess sludge pump station, sludge pump station.
    9. Prepare the CAPEX Cost
    10. Prepare the OPEX Cost

TAKE A LOOK AT OUR OTHER SERVICES

VIEW SERVICES